Preliminary and final plans for four lane highway from the Sabine Parish Line to South Mansfield. Portions of the existing two lane highway remained in place adding two lanes with a median. Responsibilities include topographic and property surveys, right-of-way maps, drainage design, preliminary roadway plans and final roadway plans.