New 245,000-sf, 8-story high-rise Courthouse building, 3-acre green space, and five-story parking garage in Tyler, TX. The new building will house 12 trial courtrooms, central jury assembly room, various administrative services, law library, district attorney’s offices and is provided with separate elevators for public use, judges and staff, and for those in custody. An additional basement level will serve as …
US 425
The project includes topographic survey, preliminary and final roadway plans and drainage design for Bastrop Log Cabin, which was originally designed as a five lane urban section for one mile with a four lane divided rural section for the remaining three miles. Because of the cost associated with right-of-way acquisition, a new typical section has been used to best fit …
US 171
Preliminary and final plans for four lane highway from the Sabine Parish Line to South Mansfield. Portions of the existing two lane highway remained in place adding two lanes with a median. Responsibilities include topographic and property surveys, right-of-way maps, drainage design, preliminary roadway plans and final roadway plans.
Palmetto Road Widening
AFJMc conducted a Line and Grade Study to three-lane a narrow two lane road. AFJMc is presently working on the 1st phase of the Preliminary Plans to widen the road and an existing two lane bridge.
Linton Road Realignment
The redesign and reconstruction of a deadly curve and the rehabilitation of the remainder of the road. AFJM corrected the curve to AASHTO and LADOTD standards to allow for a safe sight distance. AFJM also relocated an existing 8” waterline and developed Right-Of-Way maps.
I-49 North
Preliminary and final roadway and lighting plans for the revisions to I-220, the Interchange of I-49/I-220, the Interchange at Martin Luther King Drive, the south half of the Interchange at Highway 1, the roadway from I-220 to Highway 1, Martin Luther King Drive and the drainage design.
Traffic Street Widening
Widening of existing Traffic Street from a two lane road to a 5 lane section, with a divided median and apportion with a continuous left turn lane. This was a three-phase project.Third phase included a railroad underpass of the KCS railroad. Topographic and property surveys, preliminary roadway and final roadway plans, drainage design, right-of-way maps, and street lights. Lighting design …
Bossier Parish Courthouse
Five-story addition to an existing courthouse building. Structural system is composed of structural steel columns and composite concrete/steel girders and floor beams. Lateral load resisting system is composed of concentrically braced frame. Foundation is composed of augered cast-in-place concrete piles.
Benton Road Overpass
Engineering design for the installation of roadway lighting along approaches and overpass at LA Highway 3 and Benton Road Spur. The design includes substantial reconfiguration of the roadway system to accommodate the growth of Bossier City. Award: LMA Community Achievement Award in the Community Development Category for municipalities with a population of 25,001 and over.
Amiss WTP Generators
Installation of three, paralleled, 12.47kV, 2.25MW, bi-fuel generators at the City of Shreveport’s Amiss Water Treatment Plant. Generators synchronize into paralleling switchgear with a key-interlocked tie to the plant’s primary distribution system to provide on-site backup power sufficient to maintain clean water production at approximate one-half of the plant’s maximum capacity.