Widening of existing Traffic Street from a two lane road to a 5 lane section, with a divided median and apportion with a continuous left turn lane. This was a three-phase project.Third phase included a railroad underpass of the KCS railroad. Topographic and property surveys, preliminary roadway and final roadway plans, drainage design, right-of-way maps, and street lights.
Lighting design including lighting layout/design, power distribution and control. Required coordination with traffic signal engineering. Utilized architectural poles & fixtures for integration with area retail development.