Installation of three, paralleled, 12.47kV, 2.25MW, bi-fuel generators at the City of Shreveport’s Amiss Water Treatment Plant. Generators synchronize into paralleling switchgear with a key-interlocked tie to the plant’s primary distribution system to provide on-site backup power sufficient to maintain clean water production at approximate one-half of the plant’s maximum capacity.